top of page
Micropile

BRIEF CASE FACTS

Client:

Parrish and Heimbecker

G.C.:

Camar Mill Systems

Geotechnical:

Chung & Vander Doelen

Structural:

Witzel Dyce

Piles:

22 Micropiles

Loadings:

1120kn Compression
955 kN Tension per pile.

Challenges:

Active site, layers of fill, high water table

Goderich Shiploader

Goderich, ON, Canada

Camar Mill Systems with Witzel Dyce led the project to replace three ship-loaders with one super-efficient and advanced loading system at the Parrish and Heimbecker facility in the Goderich Harbor.



This site had challenges above and below the ground. Chung and Vander Doelen identified a high water table, rubble and old structures in the soil. Based on this and the loadings, a micropile foundation was determined as the best option. The EBS team was brought in to load test and then install 22 micropiles to support the tower loading requirements of 1120kN in compression 955kN in tension per pile.



This active elevator has high traffic from both trucks and ships. The site for the new foundation was in-between both. The challenge was not to interfere with either. With schedule interruptions to accommodate ship loading, drilling through rubble and obstructions and working in the small footprint, the EBS team finished installing the 22 Micropiles in just under four weeks.

More Case Histories

Want more?  Click below to navigate to other examples of our solutions in action.

bottom of page