- Location
- Ottawa, ON
EBS Geostructural supported an intricate staircase situated on a slope between the East and Centre Block of Parliament Hill using micropiles. The proposed structure was to be built on a challenging and sharp slope of greater than 1:1, creating accessibility barriers.
EBS was tasked with multifaced challenges for this substantial project including, determining how to best position installation equipment on the steep slope and establishing ways of holding the equipment in place.











