MASS TRANSIT FACILITY

Location
Toronto, Ontario

 

The existing cast in place retaining wall was to be used as a foundation wall for a pedestrian bridge at a subway station upgrade. Tiebacks were used to reinforce the wall for increased loads based on its new use. There was limited access between the existing wall and the subway track requiring compact equipment.

Depth: 7.5 metres
Total Number of Micropiles: 45