ENVIRONMENTAL CLEANUP

Location
Clyde, Ontario

A residential structure needed to be supported for soil remediation. EBS supported the foundations with Chance Helical Piers allowing the contaminated soil to be removed. Soil was removed up to 3 metres below the existing foundations.

Load: 140kN (32 kips)
Exposed Length of Helical Piles: 3 metres
Depth: 5.5 to 6.4 metres
Total Number of Helical Piles: 20 Chance Helical Piles