Client
Municipality of Meaford
Location
Meaford, Ontario
Completion Time
21 Days

A quick mobilization, poor soil conditions, and tight access created challenges, but the EBS Geostructural team tackled the issues head-on.

To provide a community space accessible to all and meet upcoming accessibility guidelines, the municipality of Meaford had to address their library. After analyzing their options, the decision was made to renovate the former Foodland location.

During interior slab demolition, the remains of a hotel destroyed by fire in 1960 were discovered. The poor soil and fill conditions required a deep foundation to support the structural alterations.  Van Horne contacted EBS Geostructural to design and install a helical pile system to retrofit the existing foundations. 

Structural drawings were created by our in-house design team, which allowed EBS to mobilize within two weeks. Variable site conditions required modification to some of the pile caps.  With the help of the EBS in-house design team, we created, approved, and implemented these design changes to keep the project progressing.

 The site had the additional challenge of limited access.  With helical pile installation required on the interior and exterior of the existing structure. Our tight access equipment allowed us to install within the structure and use only the sidewalks' space outside

Client: Municipality of Meaford

GC:  Van Horne Construction

Structural:  Engineering Link

Geo Technical: Terraprobe

Loadings: 445kN Ultimate Resistance compression and 220 kN Ultimate Resistance tension

Number of  Helical Piles -Pile caps: 32 piles, 8 caps

Timeline: Design-Build 21 days

Aerial Site View

aerial view of Meaford Library site

Aerial Site View
Corner Detail

Retrofit helical pile foundation upgrades

Corner Detail
Helical Piles

New Helical Pile additions for structural support

Helical Piles
Chance Helical Torque Indicator

Helical Pile Installation torque monitoring

Chance Helical Torque Indicator
Challenging Fill Conditions

Remains of a legacy foundation unearthed during interior slab demolition

Challenging Fill Conditions
Tight Access Installation

Small equipment allows installation inside the existing structure.

Tight Access Installation
Minimal interuption

Small equipment allowed installation from the sidewalk, with no disruption to traffic.

Minimal interuption