Belleville General Hospital

Location
Belleville, Ontario

An access tunnel within the hospital was to be constructed. EBS Geostructural Inc. installed a hybrid solider pile and lagging system in which the solider piles were cased micropiles designed to resist the lateral loads applied by the soil. This method allowed for installation in low headroom, tight access areas with the least amount of disturbance to the hospitals daily operation.